Standard Work Combination Sheet

Table showing the combination of manual work time, walk time, and machine processing time for each operation in a production sequence. Used for workload balancing.

Time Value Chart

Graph displaying value added and non value added activities over the entire lead time.

Work Center Description

Profile document used to categorize different types of operations. Can be used to collect data or as a summary.

FMEA – Failure Modes & Effects Analysis

A method aimed at anticipating failures during the design stage by identifying and prioritizing possible failures in a product or service design. Sometimes, unfortunately, also used after a failure.

ECRS Worksheet

Eliminate, Combine, Rearrange, Simplify – approach for improving processes, procedures, products, and services.

Ergonomics Checksheet

Assess work to help identify simple adjustments to improve comfort and identify any safety concerns.