Table showing the combination of manual work time, walk time, and machine processing time for each operation in a production sequence. Used for workload balancing.
A method aimed at anticipating failures during the design stage by identifying and prioritizing possible failures in a product or service design. Sometimes, unfortunately, also used after a failure.